My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-28_GENERAL DOCUMENTS - C2010088
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C2010088
>
2014-08-28_GENERAL DOCUMENTS - C2010088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:47:08 PM
Creation date
9/3/2014 8:14:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088
IBM Index Class Name
General Documents
Doc Date
8/28/2014
Doc Name
Midterm (MT1)
From
DRMS
To
Jim Stover
Permit Index Doc Type
Findings
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Worksheet Cont'd <br />Haul Route: <br />Seg # Haul Distance <br />(Ft) <br />1 1 40 <br />Return Route: <br />Task # 048 <br />Grade ( %) Roll. Res Total Res Velocity <br />( %) ( %) (fpm) <br />0.00 3.00 3.00 2824 <br />Haul Time: 1.520 <br />Travel <br />Time <br />(min) <br />1.520 <br />minutes <br />Page 3 of 3 <br />JOB TIME AND COST <br />Fleet size: l Team(s) <br />Unit cost: $5.391 /LCY <br />Total job time: 14.73 Hours <br />Total job cost: $11,462 <br />C IRC S Cast Estimating Software <br />Seg # <br />Haul Distance <br />Grade ( °fa) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Production <br />173.95 LCY / Hour Adjusted for job efficiency: <br />(Ft) <br />Truck Unit Production <br />( ° %) <br />( °! °) <br />(fptn) <br />Time <br />62.13 LCYIHour <br />Optimal No. of Trucks: <br />2 Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 186.38 <br />LCY /Hour <br />min <br />LCY /Hour <br />1 4000.00 0.00 3.00 3.00 2874 <br />1.420 <br />JOB TIME AND COST <br />Fleet size: l Team(s) <br />Unit cost: $5.391 /LCY <br />Total job time: 14.73 Hours <br />Total job cost: $11,462 <br />C IRC S Cast Estimating Software <br />Return Time: 1.420 <br />minutes <br />Total Truck Cycle Time: 6.565 <br />minutes <br />Loading Tool unit <br />Production <br />173.95 LCY / Hour Adjusted for job efficiency: <br />144.38 LCYIHour <br />Truck Unit Production <br />74.85 LCY /Hour Adjusted for job efficiency: <br />62.13 LCYIHour <br />Optimal No. of Trucks: <br />2 Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 186.38 <br />LCY /Hour <br />Adjusted single truckiloader team production: 144.38 <br />LCY /Hour <br />Adjusted multiple truck/loader team production: 144.38 <br />LCY /Hour <br />JOB TIME AND COST <br />Fleet size: l Team(s) <br />Unit cost: $5.391 /LCY <br />Total job time: 14.73 Hours <br />Total job cost: $11,462 <br />C IRC S Cast Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.