Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 047 Page 2 of 2 <br />Visibility. <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT /DAY) <br />1.000 <br />(DOZ -OC) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.4443 <br />Adjusted unit production: 552.35 LCYihr <br />Adjusted fleet production: 552.35 LCYIhr <br />JOB TIME AND COST <br />Fleet size: I Dozer(s) <br />Unit cost: $0.485 /LCY <br />Total job time: 21.09 Hours <br />Total job cost: $5,647 <br />CIRCES Cost Estimating Software <br />