Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 046 Page 2 of 2 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Rlade type: <br />1.000 <br />(AVG. <br />0.830 <br />(1 SHIFT /DAY) <br />1.000 <br />(DOZ -OC) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.4443 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />552.35 LCY /hr <br />552.35 LCYlhr <br />Fleet size: I Dozer(s) <br />Unit cost: $0.485/LCY <br />Total job tune: <br />Total job cost: <br />21.09 Hours <br />$5,647 <br />CWCE5 Cast Estimating Sullware <br />