Laserfiche WebLink
BuiIdozer Worksheet Cont'd Task # 045 Page 2 of 2 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1 .000 <br />AVG. <br />0,830 <br />(1 SHIFT/DAY) <br />1.000 <br />(DOZ -OC) <br />1.000 <br />(CAT HB) <br />(CAT HB) <br />1.000 <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.4443 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />552.35 LCY /hr <br />552.35 LCY /hr <br />Fleet size: I Dozer(s) <br />Unit cost: $0.4851LCY <br />Total job time: <br />Total job cost: <br />21.09 Hours <br />$5,647 <br />CIRCES Cost Estimating Software <br />