Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task # 005 Page 3 of 3 <br />Haul Route: <br />Seg # Haul Distance <br />(Ft) <br />1 800.00 <br />Return Route: <br />Grade ( %) Roll. Res Total Res Velocity <br />( %) ( %) (fpm) <br />0.00 3.00 3.00 2824 <br />Haul Time: 0.387 <br />Time <br />min <br />0.387 <br />minutes <br />JETS TIME AND COST <br />Fleet size: I Team(s) <br />Unit cost: $2.978 /LCY <br />Total job time: 8.80 Hours <br />Total job cost: $6,849 <br />CIRC'ES Cost Estimating Software <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />Production <br />1 <br />800.00 <br />0.00 <br />3.00 <br />3.00 <br />2874 <br />0.307 <br />145.77 LCY /Hour <br />Optimal No. of Trucks: <br />JETS TIME AND COST <br />Fleet size: I Team(s) <br />Unit cost: $2.978 /LCY <br />Total job time: 8.80 Hours <br />Total job cost: $6,849 <br />CIRC'ES Cost Estimating Software <br />Return Time: 0.307 <br />minutes <br />Total Truck Cycle Time: 3.378 <br />minutes <br />Loading Tool unit <br />Production <br />314.89 LCYIHour Adjusted for job efficiency: <br />261.36 LCY /Hour <br />Truck Unit Production <br />175.62 LCYIHour Adjusted for job efficiency: <br />145.77 LCY /Hour <br />Optimal No. of Trucks: <br />2 Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 437.30 <br />LCYIHour <br />Adjusted single truck/loader team production: 261.36 <br />LCY /Hour <br />Adjusted multiple truck/loader team production: 261.36 <br />LCYIHour <br />JETS TIME AND COST <br />Fleet size: I Team(s) <br />Unit cost: $2.978 /LCY <br />Total job time: 8.80 Hours <br />Total job cost: $6,849 <br />CIRC'ES Cost Estimating Software <br />