Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task 4 004 Page 3 of 3 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />0.00 <br />min <br />1 <br />1000.00 <br />0.00 <br />3.04 <br />100 <br />2824 <br />0.458 <br />Haul Time: 0.458 minutes <br />Return Route- <br />Seg # <br />Haul Distance <br />Grade ( °10) <br />ROIL Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( ° /fl) <br />( ° /a) <br />(fpm) <br />Time <br />0.00 <br />min <br />1 <br />1000.00 <br />3.00 <br />3.00 <br />2874 <br />0.376 <br />Return Time: 0.376 <br />Total Truck Cycle Time: 3.197 <br />Loading Tool unit <br />Production 303.65 LCY /Hour Adjusted for job efficiency: <br />Truck Unit Production <br />148.45 LCY /Hour Adjusted forjob efficiency: <br />Optimal No. of Trucks. 2 Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 369.64 <br />Adjusted single truck/loader team production: 252.03 <br />Adjusted multiple truck/loader team production: 252.03 <br />JOB TIME AND COST <br />Fleet size: I Team(s) <br />Unit cost: $3.488 ILCY <br />minutes <br />minutes <br />252.03 LCY /Hour <br />123.21 LCY /Hour <br />3 Truck(s) <br />LCY /Hour <br />LCY/Hour <br />W4 WA `.Glib <br />Total job time: 69.34 Hours <br />Total job cost: $53,967 <br />CIRCES Cost L-stimating Sottware <br />