My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-28_GENERAL DOCUMENTS - C2010088
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C2010088
>
2014-08-28_GENERAL DOCUMENTS - C2010088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:47:08 PM
Creation date
9/3/2014 8:14:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088
IBM Index Class Name
General Documents
Doc Date
8/28/2014
Doc Name
Midterm (MT1)
From
DRMS
To
Jim Stover
Permit Index Doc Type
Findings
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Worksheet Cont'd Task # 003 Page 3 of 3 <br />Hn d Rnntp- <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Travel <br />Time <br />min <br />(Ft) <br />Production <br />( %) <br />( %) <br />(fpm) <br />Time <br />3.00 <br />2874 <br />0.550 <br />106.87 LCYIHour <br />Optimal No. of Trucks: <br />2 Truck(s) Selected Number of Trucks: <br />min <br />1 <br />1500.00 <br />0.00 <br />3.00 <br />3.00 <br />2824 <br />0.635 <br />Haul Time: 0.635 minutes <br />Return Route: <br />JOB TIME AND COST <br />Fleet size: I Team(s) <br />Unit cost: $$3.361 /LCY <br />Total job time: 257.07 Hours <br />Total job cost: $200,080 <br />CTRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade ( %) <br />Roll. Res <br />(%) <br />Total Res <br />( ° %) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />min <br />Production <br />1 <br />1500.00 <br />0.00 <br />3.00 <br />3.00 <br />2874 <br />0.550 <br />106.87 LCYIHour <br />Optimal No. of Trucks: <br />JOB TIME AND COST <br />Fleet size: I Team(s) <br />Unit cost: $$3.361 /LCY <br />Total job time: 257.07 Hours <br />Total job cost: $200,080 <br />CTRCES Cost Estimating Software <br />Return Time: 0.550 <br />minutes <br />Total Truck Cycle Time: 3.686 <br />minutes <br />Loading Too] unit <br />Production <br />279.01 LCYIHour Adjusted forjob efficiency: <br />231.58 LCY /Hour <br />Truck Unit Production <br />128.76 LCY /Hour Adjusted for job efficiency: <br />106.87 LCYIHour <br />Optimal No. of Trucks: <br />2 Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 320.61 <br />LCYIHour <br />Adjusted single trucklloader team production: 231.58 <br />LCYIHour <br />Adjusted multiple truck/loader team production: 231.58 <br />LCYIHour <br />JOB TIME AND COST <br />Fleet size: I Team(s) <br />Unit cost: $$3.361 /LCY <br />Total job time: 257.07 Hours <br />Total job cost: $200,080 <br />CTRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.