Laserfiche WebLink
Task description: Fru'tta Loudaout <br />Site: Fruita Loadout <br />PROJECT IDENTIFICATION <br />COST SUMMARY WORK <br />Sheet <br />Permit Action: MT1 <br />Task #: 000 State: Colorado <br />Date: 8/26/2014 County: Mesa <br />User: ZTT <br />Agency or organization name <br />TASK LIST (DIRECT COSTS) <br />DRMS <br />Permit/Job #: C20L0088 <br />Abbreviation: None <br />Filename: C088 -000 <br />"bask <br />Description <br />Fortin <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />015 <br />020 <br />021 <br />030 <br />031 <br />032 <br />033 <br />040 <br />045 <br />046 <br />047 <br />048 <br />049 <br />050 <br />055 <br />056 <br />060 <br />061 <br />063 <br />065 <br />070 <br />075 <br />076 <br />Remove Fill from Haul Road #I and Place on <br />Facilities Area <br />TRUCKI <br />1 <br />1 <br />1 <br />1 <br />I <br />1 <br />I <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />l <br />1 <br />20.35 <br />$15,840.00 <br />$10,572.00 <br />$200,080.00 <br />$53,967.00 <br />$6,849.00 <br />$l 1331.00 <br />$6,240.00 <br />$1,674.00 <br />$212.00 <br />$75.00 <br />$34.00 <br />$848.00 <br />$1,821.00 <br />$5,647.00 <br />$5,647.00 <br />$5,647.00 <br />$11,462.00 <br />$42,013.54 <br />$1,412.00 <br />$17,168.00 <br />$21,102.00 <br />$30,944.00 <br />$6,254.00 <br />$6,290.00 <br />$323,456.50 <br />$46,179.84 <br />$5,031.31 <br />$28,967.46 <br />Remove Fill from Haul Road #2 and Place on <br />Facilities Area <br />TRUCKI <br />13.58 <br />Remove Fill from Rail Bed and Place on Facilities <br />Area <br />TRUCK l <br />257.07 <br />_ <br />Remove Matcrial from Fill Pilc and Place on <br />Facilities Area <br />TRUCK <br />69.34 <br />Remove Coal Fines from Stockpile and Place in <br />Fill <br />TRUCK l <br />8.80 <br />Compact Backfilled and Re&jaded Surfaces <br />COMPACT <br />74.72 <br />Rip Regraded Surfaces Prior to Topsoil <br />Replacement <br />RIPPER <br />22.86 <br />Rip Haul Road #1, #2 and Access Load <br />RIPPER <br />6.13 <br />Re grade Haul Road #1 <br />GRADER <br />1.92 <br />Re grade Haul Road #2 <br />GRADER <br />0.67 <br />Re grade Access Road <br />GRADER <br />0.30 <br />Re rade Li ht -Usc Road #2 <br />DOZER <br />3.17 <br />Finish Grade Disturbed Areas Prior to Seeding <br />GRADER <br />16.56 <br />Re grade Pond I <br />DOZER <br />21.09 <br />Re grade Pond) <br />DOZER <br />21.09 <br />Re grade Pond 3 <br />DOZER <br />21.09 <br />Remove Fill from Reed Wash Bridge Area to <br />Facilities Area <br />TRUCK 1 <br />14.73 <br />Reconstruct Reed Wash at Rail Bride <br />NA <br />121.22 <br />Re rade Ditches <br />DOZER <br />5.27 <br />Replace Topsoil from Stockpile I to Light -Use <br />Road and Rail <br />TRUCK <br />22.06 <br />Replace Topsoil from Stockpile 2 to Rail Loop <br />TRUCK <br />27.11 <br />Seed All Mine Areas Where Topsoil Was Replaced <br />REVEGE <br />25.40 <br />H droseed Reconstructed Reed Wash Bridge Area <br />REVEGE <br />4.00 <br />Weed Control - Spray Area 3 Times During <br />Liability Period <br />REVEGE <br />102.30 <br />Demolish and Remove All Structures <br />DEMOLISH <br />400.00 <br />Site Maintenance, Rill and Gully Repair and SAE <br />Repair <br />SITEMAINT <br />ENANCE <br />168.00 <br />Mobilize /Demobilize Equipment for Initial <br />Reclamation <br />M0131LIZE <br />4.00 <br />Mobilize(Demobilize Equipment for Site <br />MOBILIZE <br />17.66 <br />