Laserfiche WebLink
Truck/Loader Worksheet Com'd Task # 056 Page 3 of 3 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Rail. Res <br />Total Res <br />Velocity <br />Travel <br />294.96 LCY/Hour Adjusted forjob efficiency: <br />(Ft) <br />M) <br />( %) <br />(fpm) <br />Time <br />Adjusted hourly truck team production: 382.63 <br />Adjusted single truck/loader team production; 244.81 <br />Adjusted multiple truck/loader team production: 244.81 <br />min <br />1 <br />900.00 <br />0.00 <br />3.00 <br />3.00 <br />2824 <br />0.422 <br />Haul Time: <br />Return Route: <br />0.422 <br />minutes <br />Seg # <br />Haul Distance <br />Grade ( %} <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />294.96 LCY/Hour Adjusted forjob efficiency: <br />(Ft) <br />M) <br />( %) <br />(rpm) <br />Time <br />Adjusted hourly truck team production: 382.63 <br />Adjusted single truck/loader team production; 244.81 <br />Adjusted multiple truck/loader team production: 244.81 <br />min <br />1 <br />900.00 <br />0.00 <br />3.00 <br />3.00 <br />2874 <br />0.342 <br />JOB TIME AND COST <br />Fleet size: I Team(s) <br />Unit cost: $3.179 /LCY <br />minutes <br />minutes <br />244.81 LCY /Hour <br />127.54 LCY /Hour <br />3 Truck(s) <br />LCY /Hour <br />LCY /Hour <br />LCY /Hour <br />Total job time: 27.11 Hours <br />Total job cost: $21,102 <br />C[RCES Cost Estimating Software <br />Return Time: 0.342 <br />Total Truck Cycle Time: 3.265 <br />Loading Tool unit <br />Production <br />294.96 LCY/Hour Adjusted forjob efficiency: <br />Truck Unit Production <br />153.67 LCY /Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: <br />2 Truck(s) Sclectcd Number of Trucks: <br />Adjusted hourly truck team production: 382.63 <br />Adjusted single truck/loader team production; 244.81 <br />Adjusted multiple truck/loader team production: 244.81 <br />JOB TIME AND COST <br />Fleet size: I Team(s) <br />Unit cost: $3.179 /LCY <br />minutes <br />minutes <br />244.81 LCY /Hour <br />127.54 LCY /Hour <br />3 Truck(s) <br />LCY /Hour <br />LCY /Hour <br />LCY /Hour <br />Total job time: 27.11 Hours <br />Total job cost: $21,102 <br />C[RCES Cost Estimating Software <br />