Laserfiche WebLink
C. Immediately reseed areas showing bare spots. <br />D. Repair washouts or gullies. <br />E. Protect seeded areas with warning signs during maintenance period. <br />3.5 SCHEDULE <br />A. Seed all areas where topsoil is placed, including all disturbed areas outside of liner <br />construction, and portions of the liner above the normal operating water surface <br />elevation. <br />END OF SECTION <br />NCCI Pit #1 Reservoir Liner - Technical Specifications Seeding <br />329219 -4 <br />