Laserfiche WebLink
3.2 SITE STABILIZATION <br />A. Incorporate erosion control devices indicated in the SWMP into the Project at the earliest <br />practicable time. <br />B. Construct, stabilize and activate erosion controls before site disturbance within tributary <br />areas of those controls. <br />3.3 FIELD QUALITY CONTROL <br />A. Inspect erosion control devices per the SWMP and after each runoff event. Make <br />necessary repairs to ensure erosion and sediment controls are in good working order. <br />3.4 CLEANING <br />A. Section 01 70 00 - Execution and Closeout Requirements: Requirements for cleaning. <br />B. When sediment accumulation in sedimentation structures has reached a point one -half <br />depth of sediment structure or device, remove and dispose of sediment. <br />C. Do not damage structure or device during cleaning operations. <br />D. Do not permit sediment to erode into construction or site areas or natural waterways. <br />E. Clean channels when depth of sediment reaches approximately one half channel depth. <br />3.5 PROTECTION <br />A. Section 0170 00 - Execution and Closeout Requirements: Requirements for protecting <br />finished Work. <br />END OF SECTION <br />NCCI Pit #1 Reservoir Liner - Technical Specifications Erosion Controls <br />312513 -2 <br />