Laserfiche WebLink
Engineer. <br />2. Adjacent to restrictive areas as approved by the Engineer, compaction by rubber - <br />tired equipment of a layer of earthfill not to exceed 2 feet in horizontal width may be <br />substituted for compaction by mechanical tampers: Provided, That smooth surface <br />left by the use of rubber -tired equipment shall be treated as prescribed above, prior to <br />placement of the subsequent layer of earthfill. <br />3. The water content control and density control shall be equivalent to that obtained <br />in the earthfill placed in the liner embankment in accordance with this <br />specification. <br />3.4 FIELD QUALITY CONTROL <br />A. Section 0140 00 - Quality Requirements. <br />a. PROTECTION OF FINISHED WORK <br />A. Section 01 70 00 - Execution and Closeout Requirements <br />END OF SECTION <br />NCCI Pit #1 Reservoir Liner - Technical Specifications Fill <br />31 23 23 - 12 <br />