My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-29_REVISION - M2001107
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001107
>
2014-08-29_REVISION - M2001107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:28:21 PM
Creation date
8/29/2014 4:19:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001107
IBM Index Class Name
Revision
Doc Date
8/29/2014
Doc Name
Technical revision request TR08
From
J&T Consulting, Inc.
To
DRMS
Type & Sequence
TR8
Email Name
PSH
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Engineer. <br />2. Adjacent to restrictive areas as approved by the Engineer, compaction by rubber - <br />tired equipment of a layer of earthfill not to exceed 2 feet in horizontal width may be <br />substituted for compaction by mechanical tampers: Provided, That smooth surface <br />left by the use of rubber -tired equipment shall be treated as prescribed above, prior to <br />placement of the subsequent layer of earthfill. <br />3. The water content control and density control shall be equivalent to that obtained <br />in the earthfill placed in the liner embankment in accordance with this <br />specification. <br />3.4 FIELD QUALITY CONTROL <br />A. Section 0140 00 - Quality Requirements. <br />a. PROTECTION OF FINISHED WORK <br />A. Section 01 70 00 - Execution and Closeout Requirements <br />END OF SECTION <br />NCCI Pit #1 Reservoir Liner - Technical Specifications Fill <br />31 23 23 - 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.