My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-29_REVISION - M2001107
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001107
>
2014-08-29_REVISION - M2001107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:28:21 PM
Creation date
8/29/2014 4:19:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001107
IBM Index Class Name
Revision
Doc Date
8/29/2014
Doc Name
Technical revision request TR08
From
J&T Consulting, Inc.
To
DRMS
Type & Sequence
TR8
Email Name
PSH
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Construct fill and waste areas by selective placement to avoid erosive surface silts or <br />clays. <br />E. Periodically inspect earthwork to detect evidence of erosion and sedimentation; promptly <br />apply corrective measures. <br />F. Comply with all Federal, State, and local regulations concerning erosion and sediment <br />control, and dewatering and stormwater discharges related to construction activity. <br />1.18 NOISE CONTROL <br />A. Provide methods, means, and facilities to minimize noise produced by construction <br />operations. <br />B. Comply with all Federal, State, and local regulations concerning erosion and sediment <br />control, and dewatering and stormwater discharges related to construction activity. <br />1.19 POLLUTION CONTROL <br />A. Provide methods, means, and facilities to prevent contamination of soil, water, and <br />atmosphere from discharge of noxious, toxic substances, and pollutants produced by <br />construction operations. <br />B. Comply with pollution and environmental control requirements of the Colorado <br />Department of Health and Environment, and the Environmental Protection Agency. <br />1.20 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS <br />A. Remove temporary utilities, equipment, facilities, materials, prior to Final Completion <br />inspection. <br />B. Clean and repair damage caused by installation or use of temporary work. <br />PART 2 PRODUCTS - Not Used <br />PART 3 EXECUTION - Not Used <br />END OF SECTION <br />NCCI Pit #1 Reservoir Liner - Technical Specifications Temporary Facilities And Controls <br />015000 -4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.