Laserfiche WebLink
Permit M- 1977 -342 (Henderson Mine and Mill) <br />Proposed TR -24 — Mill TDL Drop Tower 13 & 14 Removal <br />Once the droptowers and jointed RCP is removed, it will be replaced with 2,500 feet of 42" <br />HDPE pipe. At the upper end, this will connect to the base of Drop Tower 12. On the lower <br />end, this will connect to the 42" HDPE pipe proposed in Technical Revision No. 22. <br />The above changes, once completed, will provide the TDL with additional structural integrity to <br />allow continued conveyance of tailing slurry through the current, expected life of Henderson <br />operations. <br />If you have any comments, questions or concerns regarding this project, please do not hesitate to <br />contact me at 720 - 942 -3480, Bryce Romig at 720 - 942 -3231 or Tim Haynes at 720 - 942 -3518. <br />Regards, <br />Amber Parmet <br />Environmental Engineer II <br />Freeport- McMoRan Copper & Gold <br />Climax Molybdenum Company <br />Henderson Mill <br />19302 County Road 3 <br />Parshall, CO 80468 <br />720 - 942 -3480 <br />amber _parmet @fini.com <br />Attachments: <br />1. Drawing <br />2. Check #0000823290 in the amount of $1,006.00 <br />CC: B. Romig (CMC) <br />M. Hamarat (CMC) <br />T. Haynes (CMC) <br />File <br />Page 2 <br />