Laserfiche WebLink
Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND -RF) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3890 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />544.60 LCY /hr <br />544.6 LCY /hr <br />Fleet size: <br />I Dozer(s) <br />Unit cost: <br />$0.395/LCY <br />Total job time: <br />158.30 Hours <br />Total job cost: <br />$34,079 <br />Page 4 of 12 <br />CIRCES Cost Estimating Software <br />