My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-03_PERMIT FILE - C1981035A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035
>
2014-07-03_PERMIT FILE - C1981035A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 7:47:30 AM
Creation date
8/27/2014 1:57:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
7/3/2014
Doc Name
RECLAMATION PLAN
Section_Exhibit Name
KII 2.05.4 Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N) Executive Offices/ Parts Warehouse/ Bath House Building: 60V x <br />• 150'L x 34'H steel building to contain all administrative offices, miner's <br />changing and shower facilities, and a spare parts/ supplies warehouse. <br />O) Covered Storage: This 20W' x 80L' xl9'H open steel building will be <br />of pole barn style construction, with steel post uprights and stringers, <br />covered on the roof and three sides by corrugated steel. <br />P) Main Septic System Tank: This structure is a concrete tank that will <br />be broken up and left in place during reclamation. All pipes to the tank <br />will be removed and disposed of during reclamation. <br />Q) Parking Area: A 120x175' graveled area adjacent to the Office <br />Building. The gravel will be excavated and used for backfill at the portal <br />area. <br />R) Fuel Storage Area: This 25W' x 45L' x20'H steel 3 sided structure <br />will house one 2000 gallon diesel fuel tank with containments for fueling <br />and an contained area for storage of lubricants for underground and <br />surface diesel powered machines. <br />S) Main Septic System Drain Field: This structure is comprised of an <br />underground gravel field that will be left in place during reclamation. All <br />pipes to the drain field will be removed and disposed of during <br />reclamation. <br />• T) Belt Portal Structure: This concrete and steel structure will be <br />broken and used for portal backfill. <br />U) Return Portal Structure: This concrete and steel structure will be <br />broken and used for portal backfill. <br />V) Belt Portal Pump House: Concrete building used to house various <br />pumps and plumbing. This building as well as piping will broken and <br />used for portal backfill. <br />W) Temporary Waste Rock Storage Area: This area is to be used for <br />temporary storage of underground mine waste rock waiting to be <br />transported the refuse pile at the King I mine. <br />X) Bermed Topsoil Storage #2: Stored topsoil from this open pile will <br />be re- spread on the disturbed areas after backfilling and grading. The <br />bulk of salvage soil material from the site is very similar in composition <br />and will be used for backfilling and topsoil as needed. The footprint of <br />the topsoil storage area will be reseeded during re- vegetation. <br />Y, Y1) Electrical Substation: Electrical transformers and infrastructure, <br />including transmission lines, poles, switchgear, concrete slabs and <br />control room) will be removed. The gravel base for the 60 x 80 foot <br />• GCC Energy, LLC King II Mine <br />Section 2.05.4 <br />Page 3 November, 2009 <br />Tk. -IS <br />
The URL can be used to link to this page
Your browser does not support the video tag.