Laserfiche WebLink
Hydrologic Desi ns - Fleming Engineering, Inc. Introduction <br />11 <br />1 Sediment Pond "As- Built ", J.T. Paluso, P.E. <br />2 On Site Basin Flows, Fleming Engineering, Inc. <br />(3) On Site Culvert and Ditch Capacities, Fleming <br />Engineering, Inc. <br />(4) East and West Clean Water Ditch Verification, J.T. <br />Paluso, P.E. <br />(5) Safety Factor Analysis for Sediment Pond, J.T. <br />Paluso, P.E. <br />(6) Sediment Pond Certification by Fleming Engineering, <br />Inc., <br />- Sediment Pond "As Built" and Runoff Control <br />Structures. Verification for Drainages; Basin A and <br />Basin B, EIS Environmental 8a Engineering Consulting. <br />- Retention Pond (sic) Compaction Test Results, Trautner <br />Geotechnical Services. <br />Reclamation Bond Estimate <br />12 <br />1 Prepared by GCC Energy, LLC <br />(2) Prepared by Colorado Division of Reclamation, <br />Mining &, Safety <br />GCC Energy, __ <br />Table of Contents <br />Page iii <br />ig II Mine <br />May 7, 2014 <br />73A- 22 <br />,R pprped <br />03.Aif • 20 H <br />