Laserfiche WebLink
1 *0 me 11 11311 a 11 <br />FUTURE ALTERNATE RECLAMATION PLAN B (Sheet 2A of 2): <br />The mining limits of this Reclamation Plan is a 0.69 acre site acre site located in the southeasterly <br />corner of the permit boundary. The remainder of the Permit Boundary area lying outside of the <br />mining limits is undisturbed and is not a part of this Reclamation application. <br />Luke the Duke, LLC is proposing to reclaim the pit to General Agricultural. The pit will be plated <br />with approximately 8 " -12" of overburden and then covered with the stockpiled topsoil and <br />sculptured into the existing terrain at a 3:1 slope. No other slopes were disturbed during the mining <br />process. <br />To prevent soil compaction no wheel or track mounted vehicles or equipment will be allowed on <br />the reclaimed surface subsequent to top soil installation. To stabilize the non - compacted top soil a <br />Dry land Pasture blend seed mixture will be no till drilled over the topsoil at a rate of 20lbs per <br />acre. The seed will be hand raked into the topsoil. New lawn fertilizer will be applied per the <br />manufacturer's requirements. Straw mulch will be hand spread at a rate of one ton per acre. The <br />applicant will be responsible for any weed control once the grass is established. The site will be <br />seeded in the spring of 2016. <br />The stockpiled gravel will be removed and used for the maintenance of the subdivision roads <br />within Avery Ranch, Horseman's Park, Cross Creek Ranch, the Highlands at Cross Creek Ranch <br />and the Preserve. <br />No office, shop /maintenance buildings, processing facilities, or underground openings are existing <br />or proposed. No on -site water is to be used in conjunction with this operation. The hydrology of <br />the site will not be altered from its natural flows. <br />The estimated start date of this Reclamation Project would be September 2015 and the completion <br />date would be in the spring of 2017. The maximum disturbance point of this mining would be at <br />the time the remaining gravel is removed from the site. <br />1. SPREAD TOPSOIL ON SITE: <br />Hourly Equipment Cost <br />Ownership Cost/Hour <br />Operating Cost/Hour <br />Operator Cost/Hour <br />Fleet Size (No. Units) <br />TOTAL UNIT COST/HOUR <br />$ 46.94 <br />$ 69.39 <br />$ 38.54 <br />1 <br />$ 154.87 <br />