)// <br />EXHIBIT D <br />FUTURE RECLAMATION PLAN A (Sheet 2 of 2): <br />The mining limits of this Reclamation Plan is a 0.69 acre site located in the southeasterly corner <br />of the permit boundary. The remainder of the Permit Boundary area lying outside of the mining <br />limits is either undisturbed and is not a part of this Reclamation application. <br />Luke the Duke, LLC is proposing to reclaim the pit as Developed Water Resources. The pit will <br />be sculptured into ponds and the bottoms will be plated with approximately 8 " -12" of overburden. <br />The ponds will be approximately 13 feet deep with 3:1 slopes. No other slopes were disturbed <br />during the mining process. <br />Fifty Aspen trees (3' -4' tall) will be planted around the perimeter of the pond. These trees will be <br />maintained from the pond until such time they are established. The stockpiled top soil will be <br />reclaimed and spread over the site at a 12" depth where needed. To prevent soil compaction no <br />wheel or track mounted vehicles or equipment will be allowed on the reclaimed surface subsequent <br />to top soil installation. To stabilize the non - compacted top soil a Dry land Pasture blend seed <br />mixture will be no till drilled over the topsoil at a rate of 20lbs per acre.. New lawn fertilizer will <br />be applied per the manufacturer's requirements. Mulch will be spread over the seeded area at a <br />rate of 1 ton per acre. The applicant will be responsible for any weed control once the grass is <br />established. The site will be seeded in the spring of 2016. <br />The stockpiled gravel will be removed and used for the maintenance of the subdivision roads <br />within Avery Ranch, Horseman's Park, Cross Creek Ranch, the Highlands at Cross Creek Ranch <br />and the Preserve. <br />No office, shop /maintenance buildings, processing facilities, or underground openings are existing <br />or proposed. No on -site water is to be used in conjunction with this operation. The hydrology of <br />the site will not be altered from its natural flows. <br />The estimated start date of this Reclamation Project would September 2015 and the completion <br />date would be in the spring of 2017. The maximum disturbance point of this mining would be at <br />the time the remaining gravel is removed from the site. <br />1. SPREAD TOPSOIL ON SITE: <br />Hourly Equipment Cost '"° C7 1--� <br />Ownership Cost/Hour = $ 46.94 <br />AUG' 2 2W4 <br />Operating Cost/Hour = $ 69.39 <br />Operator Cost/Hour = $ 38.54 D ",E' <br />Fleet Size (No. Units) = 1 <br />