Laserfiche WebLink
Notes for site visit August 21, 2014: <br />My site visit began at noon. Our first stop was Pond C, efforts were <br />underway again to dewater the pond in an effort to get it cleaned out. <br />Our next stop was gob pile #2. The top of the pile is in better shape <br />than it was two weeks ago, but the rain over the last few weeks has <br />really slowed down progress. Of the windrows that were created <br />when the monsoon's began, all but one has been knocked down and <br />compacted. There has been good progress placing & compacting gob <br />in the TR -76 area, between benches 2/3. <br />There was no gob being hauled to gob pile #2 during my visit, <br />everything was being diverted to gob pile #3 or the gob pile #3 drying <br />area. <br />The west half of gob pile #4 where coverfill has been placed continues <br />to be a work in progress. Final grading will occur this fall when topsoil <br />and seed will be placed. Ditches F19 & 20 had recently been <br />maintained and it appeared that there was positive drainage. Ditch <br />F18 needs to be regraded to provide for better flow to Ditch F -21 -1. <br />At gob pile #3 work has begun on relocating the west coverfill <br />stockpile. Topsoil has been stripped north of the east coverfill <br />stockpile and hauled to stockpile F /F1. The small topsoil stockpile <br />that was north of the east coverfill pile has been relocated to <br />stockpile F /F1. The west coverfill stockpile will be relocated to this <br />newly prepared area, it will be called the "north" coverfill stockpile. <br />Material will be moved from the west coverfill stockpile footprint and <br />stored in the "North" Coverfill stockpile. When the first two benches <br />at gob pile #2 are to final grade, coverfill from the north stockpile will <br />be hauled back to the pile for final reclamation. <br />The underdrain was functional and clean water was flowing from the <br />outlet. <br />A lot of material has been hauled from the drying area and placed and <br />compacted on gob pile #3. <br />1 <br />