Laserfiche WebLink
•-. <br />District Court, Water Division No. 7 <br />.4pplication of Clark-, Case No. 1 l C W69 <br />Findings of Fact, Conclusions of Law, Ruling ofthe <br />Referee. Judgment and Decree <br />Page 5 <br />10. The statements in the Application are true, except as modified herein. <br />11. The Application filed herein is complete, covering all applicable mugtters required under <br />C.KS. §37 -92 -342. <br />12. All notices required by law have been given, and no further notice need be given. C.R.S. § <br />37 -92 -101, e1 seq. <br />13. The Court has jurisdiction of this platter and of all persons, whether they have appeared or <br />not. C.R.S. §37-92-301(2) and - 303(1). <br />14. This Court has authority approve the conditional water rights described in the Application. <br />C.R.S. §§37-92-301(2),-302 and - 303(1). <br />PULING OF TM REFEREE <br />15. The foregoing Findings of Fact and Conclusions of Law are incorporated as if fully set forth <br />herein. <br />16. The Applicants have shown that they have taken a substantial step toward appropriating for <br />beneficial use the water rights described herein in paragraphs 5, 6 and 7 for the Clark Pond <br />No. 2, Maggie Ditch and Pipeline and Claris Pond No. 1, respectively, and such conditional <br />water rights are hereby confirmed; subject; however, to all earlier priority rights of others <br />and to the integration and tabulation by the Division Engineer of such priorities and <br />changes of rights in accordance with law. <br />17. Prior to the construction of dams for Clark Pond No. 1 and Clark Pond No. 2, Applicants <br />must submit a Notice of Intent to Construct a Nora - Jurisdictional Water Impoundment <br />Structure to the Division Engineer's office. <br />18. Upon completion of mining operations, Applicants shall apply for a well permit for Clark <br />Pond No. 1 prior to any application for absolute status as it intersects groundwater. Area <br />capacity tables for Clark Ponds Nos. 1 and 2 shall accompany any application for <br />absolute status. <br />19. Applicants shall comply with the orders of the Division Engineer to install necessary <br />measuring devices and administrative structures, and shall keep records and make reports <br />as reasonably requested by the Division Engineer. <br />CLMK.l IM691mpwad ndWg <br />