My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-26_ENFORCEMENT - C1981010
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1981010
>
2014-08-26_ENFORCEMENT - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 6:54:04 PM
Creation date
8/26/2014 8:38:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Enforcement
Doc Date
8/26/2014
Doc Name
Notice of Violation
From
DRMS
To
Trapper Mining, Inc
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE TO NOTICE OF VIOLATION <br />Notice of Violation No.: CV- 2014 -006 <br />NATURE OF VIOLATION: <br />Failure to remove topsoil, store topsoil and post topsoil markers at development drill pads and failure to <br />implement sediment control measures at development drill pads. <br />ACT, REGULATION, OR PERMIT PROVISION(S) VIOLATED: <br />ACT SECTION(S): <br />34- 33- 120(2)(e) <br />34- 33- 120(2)0)(11) <br />REGULATIONSECTION(S): <br />4.06.2, 4.06.3, 4.02.7, 4.05.5 <br />PERMIT SECTION(S): <br />3.3.2.1, 3.2.1, 3.2.2, 3.1.1 <br />PORTION OF THE OPERATION TO WHICH THIS NOTICE APPLIES: <br />Development drill pads; 2014 -M6, 2014 -M7, 2014 -M3, 2014 -M2, 2014 -M1, 2014 -M11, 2014 -M8, 2014 -M9 and 2014 - <br />M10. Located near the eastern permit boundary within the NE1 /4 and SE1 /4 of Section 32, Township 6 North, Range 90 <br />West and in the NE 1/4 and SE 1/4 of Section 5, Township 5 North, Range 90 West of the 6th principle meridian. <br />STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION): <br />Abatement Step 4 Description <br />1 Remove and store any salvageable topsoil from development drill pads where topsoil had not <br />been removed during pad construction and has not been drilled. Store the salvageable topsoil <br />in a stockpile in compliance with Rule 4.06.3. <br />2 Post topsoil markers on stored topsoil at the development drill pad sites in accordance with <br />Rule 4.02.7 and permit section 3. 1.1 or the Trapper Mine permit. <br />3 Construct the small pits to contain water from drilling operations at the drill pads were drilling <br />will occur in accordance with section 3.3.2.1 of the Trapper Mine permit. <br />TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS): <br />ON OR BEFORE last abatement due date <br />Abatement Step 4 Due Date <br />1 September 22, 2014 <br />2 September 22, 2014 <br />3 September 22, 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.