Laserfiche WebLink
Ln <br /> Ow <br /> +-� w <br /> o z <br /> ? N NZa <br /> LU IC- CC Table 2a <br /> U tJ cr W�U Hek Sand 8 Gravel Mine <br /> Operational Losses <br /> (1} (2) (3) (4) (6) (7) (8) <br /> Month Percent of Amount of Water Lost Amount of Water Lost Water Used Total Lagged <br /> Annual Aggregate With!dined Concrete In Concrete for Dust Operational Operational <br /> Aggregate Production Aggregate Production Batching Control Losses Losses <br /> Production <br /> (law) to-ktt) (Yd') (aaa-IeW ( ) (aaarfae0 (aoeaee0 <br /> January 3.8% 18,568 0.41 0 0.00 0.04 0.45 0.80 <br /> February 4.6% 22.356 0.49 0 0.00 0.05 0.54 0.71 <br /> March 5.5% 26.738 0.59 0 0.00 0.06 0.65 0.76 <br /> April 9.6% 46,643 1.03 0 0.00 0.10 1.13 0.76 <br /> May 12.5a/a 60,606 1.34 0 0.00 0.12 1.46 0.95 <br /> Juno 13.9% 67,588 1.49 0 0.00 0.14 1.63 1.05 <br /> July 13.9% 67,588 1.49 0 0.00 0.14 1.63 1.20 <br /> August 12.5% 60,606 1.34 0 0.00 0.12 146 1.25 <br /> September 9.6% 46,643 1.03 0 0.00 0.10 1.13 1.19 <br /> October 5.5% 26,738 0.59 0 O.DO 0.06 0.65 1.13 <br /> November 4.6% 22,356 0.49 0 0.00 0.05 0.54 0.95 <br /> December 3.8% 18,568 0.41 0 0.00 0.04 0.45 0.88 <br /> Total 100% 485,000 10.7 0 0.0 1.00 11.7 11.7 <br /> (1)Equah column(2)moo*Y*a dmded 500.000 Wnsyear. <br /> M Baud on Mdomiabon lwtn Poem Sod 6 Cyaael <br /> (3)EwA Column(2)Imes 7.0001i m A diM W by 624 dwrbd by 43.560. <br /> (4)and on inknAon boo Pimear Sand i G*A1 <br /> (5)Equals Column(4)toes 2H&s a4 wow pe W or wrote dmded by 62.4 dN*d by 43.560. <br /> (6)Based an nbnnaWn bom Ponwor Sand 6 GrawL <br /> (7)EWab Coluem(3)plus Cabwe 15)plus Caamn(61. <br /> (51 Based on SEO Gbvel cakWalions 0-7000 R T-140,000 9Pun 6 S=0.2 No F)aw=10.000 It. <br /> (91 Equais One sun arcobrm(711ims the mor4*vahxs n Comm(81. <br /> (10)Equas Column(9)plus Tabk 1.Column(g) <br /> • sn.a+� <br />