Laserfiche WebLink
Mr. Joe Kraig Page 4 of 4 • <br /> Heit SWSP <br /> August 21, 2014 <br /> 13. Replacement of lagged depletions shall continue until there is no longer an effect on stream <br /> flow. <br /> 14. This substitute water supply plan may be revoked or modified at any time should it be <br /> determined that injury to other vested water rights has or will occur as a result of this plan. <br /> Should this substitute water supply plan expire without renewal or be revoked prior to <br /> adjudication of a permanent plan for augmentation, all excavation of product from below the <br /> water table, and all other use of water at the pit, must cease immediately. <br /> 15. In accordance with amendments to Section §25-8-202-(7), C.R.S. and Senate Bill 89-181 <br /> Rules and Regulations adopted on February 4, 1992, the State Engineer shall determine if <br /> this substitute water supply plan is of a quality to meet requirements of use to which the <br /> senior appropriation receiving the substitute supply has normally been put. As such, water <br /> quality data or analyses may be requested at any time to determine if the requirement of use <br /> of the senior appropriator is met. <br /> 16. The decision of the state engineer shall have no precedential or evidentiary force, shall not <br /> create any presumptions, shift the burden of proof, or serve as a defense in any pending <br /> water court case or any other legal action that may be initiated concerning this plan. This <br /> decision shall not bind the state engineer to act in a similar manner in any other applications <br /> involving other plans, or in any proposed renewal of this plan, and shall not imply <br /> concurrence with any findings of fact or conclusions of law contained herein, or with the <br /> engineering methodologies used by the Applicant. <br /> If you have any questions concerning this approval, please contact loana Comaniciu in <br /> Denver at (303) 866-3581 or Dean Santistevan in Greeley at (970) 352-8712. <br /> Sincerely, kilL; <br /> , Jeff eatherage, P.E. <br /> of Water Supply <br /> Attachments: Tables 1-3 <br /> City and County of Broomfield Lease (3`d Extension) <br /> Administration Protocol `Augmentation Plan Accounting, Division One—South Platte River" <br /> Cc: Bill Schneider, Water Commissioner District 2, William.Schneider(c)_state.co.us <br /> Brent Schantz, South Platte River Operations Coordinator,Brent.Schantza_state.co.us <br /> Division of Reclamation, Mining and Safety <br /> JD/JMW/idc <br />