Laserfiche WebLink
August 18, 2014 C- 1981 - 010 /Trapper Mine JLE <br />Figure 28.) Development drilling pad 2014 -M10. Cut made for the pad and soil profile is <br />visible. <br />Figure 29.) Development drilling pad 2014 -M10. Actively drilling the pad during inspection. <br />Pad partially made from soil material. <br />Number of Partial Inspection this Fiscal Year: 1 <br />Number of Complete Inspections this Fiscal Year: 1 <br />Page 21 of 24 <br />