My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-25_REVISION - C1982056 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2014-08-25_REVISION - C1982056 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:47:01 PM
Creation date
8/25/2014 10:39:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
8/25/2014
Doc Name
Letter and Application
From
Twentymile Coal, LLC
To
DRMS
Type & Sequence
MR280
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
anticipated road maintenance /construction disturbance requirements will be approximately 7,150 feet <br />(4.0 acres with a 25 ft. maximum road disturbance width). <br />Drill pads will be approximately 250 x 250 feet (1.43 acres), with soil material stripping limited to an <br />area around the drillhole collar, and the area surrounding any mud pits necessary to support drilling <br />operations, in order to minimize disturbance and facilitate site reclamation. If additional site work is <br />required to establish a level pad, any affected areas will be stripped and the soil material stockpiled for use in <br />reclaiming the site. Wattles, sediment fence, and/or berms will be used to control site drainage and prevent off - <br />site sediment transport, with drainage and sediment control for the associated disturbance being addressed as <br />Small Area Exemptions (SAE'S). Nominal 7.875 -inch drillholes (with 10.75 -inch hole for surface casing <br />to 40 ft. depth) will be completed using conventional rotary drilling methods and drilling mud as the <br />circulation medium, to depths ranging from 1,200 to 1,600 feet. Core samples will be recovered from <br />all drillholes, and all drillholes will be geophysically logged. On completion of drilling and logging, <br />all drillholes will be plugged and sealed in accordance with State Engineer requirements, and drill sites <br />will be reclaimed. <br />This submittal includes revised PAP text and supporting materials, as identified by the accompanying <br />Summary of Revisions /Additions. In order to complete drilling before weather conditions become too <br />adverse, TC would like to initiate the proposed activities as soon as possible, and therefore, requests <br />the assistance and cooperation of the CDRMS is completing review and approval of this application in <br />a timely manner. Once you have opportunity to review this submittal, please feel free to contact me <br />with any questions, or to discuss the submittal and related matters. We appreciate your attention and <br />assistance. <br />Best <br />Manager <br />cc: Mike Berdine /TC <br />Will Dennis /TC <br />
The URL can be used to link to this page
Your browser does not support the video tag.