My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-15_REPORT - C1996083 (3)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2014-08-15_REPORT - C1996083 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:46:46 PM
Creation date
8/22/2014 9:55:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Report
Doc Date
8/15/2014
Doc Name
August 14, 2014 J.E. Stover & Associates Site Visit Report
From
J.E. Stover & Associates
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
SLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Notes for site visit August 14, 2014: <br />There was a light drizzle when I initially arrived on site, and by the time Bill <br />and I began our inspection, at around 8:15, it was a steady rainfall. <br />Conditions were very wet and very muddy. We first stopped at Pond C. Last <br />week, the pond was dewatered and being left to dry out so it could be <br />cleaned out, but before the Pond was cleaned out, the rain started. Ponds <br />B, D, and F have been cleaned out. Pond D had been recently dewatered <br />and was below the primary spillway elevation. Pond F held approximately 2' <br />of water. <br />The next stop was near the top of gob pile #2. Gob from the wash plant was <br />being hauled to the top of the pile. Due to slick and wet conditions, we were <br />not able to access the very top. We stopped at the location where <br />employees park their vehicles and visually inspected what we could see of <br />the pile. Overall, while wet and muddy, it looked fairly good. No standing <br />water was observed. <br />The first two benches of pile #2 are almost to final grade. The gob at the toe <br />of bench #2 shown in last weeks report had been hauled back to the top of <br />the pile and /or the TR -76 area. There was a section of stacked gob in the <br />TR -76 area that was dry looking and was most likely from the toe of bench <br />#2. Ditch F7 had recently been cleaned out. <br />We drove by gob pile #3, where there was very little activity. From Bowie <br />road, there did not appear to be standing water on the pile. <br />Wingwalls will be installed at the inlets of Culverts J -6 & 7 in an effort to <br />better protect the canal. A minor revision will be submitted in the next <br />week for the proposed wingwalls. <br />A design is currently underway to expand gob pile #3 to the west, between <br />ditch J9 and the overhead conveyor. A technical revision will be submitted <br />for the proposed expansion. Before gob is expanded into this area, subsoil <br />may be excavated and potentially mixed with gob over the winter months. <br />However, no gob will be placed in this area until the revision is approved. <br />The small topsoil stockpile north of the east coverfill stockpile will be moved <br />to stockpile F /F1. The remaining topsoil north of the east coverfill stockpile <br />will be salvaged and placed in stockpile F /F1. This area will become part of <br />an expanded east coverfill stockpile. <br />There will be increased activity at or near the west coverfill stockpile. <br />Coverfill will be used for building the road along the north edge of gob pile <br />#3, and hauled back to the first two benches of gob pile #2 for final <br />reclamation. <br />The remaining material in the west stockpile will be scraped and re- located <br />to the east stockpile. The next step will be subsoil excavation in the <br />footprint of the west coverfill stockpile, which will be at least 15' deep to <br />meet the requirements of final reclamation. The east stockpile will expand <br />to the north to provide storage for excavated subsoil. <br />The road on the north side of gob pile #3 is ready for coverfill placement as <br />soon as conditions are dry enough. Plans were to begin placing dirt today, <br />but due to inclement weather conditions, work had been postponed. <br />