Laserfiche WebLink
Loader Worksheet Cont'd Task#020 Page 2 of 2 <br /> Total Travel Time: 0.0254 minutes <br /> Total Cycle Time: 0.4104 minutes <br /> Load Bucket Capacity <br /> Rated Capacity: 0.53 LCY(heaped) <br /> Bucket Fill Factor: 1.100 Other-rock/dirt mixtures (100-120%) 1.100 <br /> Adjusted Capacity: 0.58 LCY <br /> Job Condition Correction Factors <br /> Site Altitude:6700 feet <br /> Source <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.83 (1 shift/day) <br /> Net Correction: 0.83 multiplier <br /> Unadjusted Hourly Unit Production: 85.24 LCY/Hour <br /> Adjusted Hourly Unit Production: 70.75 LCY/Hour <br /> Adjusted Hourly Fleet Production: 70.75 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Loader(s) Total job time: 6.29 Hours <br /> Unit cost: $0.916 /LCY Total job cost: $407 <br /> CIRCES Cost Estimating Software <br />