My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-21_PERMIT FILE - P2014016
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2014016
>
2014-08-21_PERMIT FILE - P2014016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2020 4:23:19 PM
Creation date
8/22/2014 7:45:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2014016
IBM Index Class Name
Permit File
Doc Date
8/21/2014
Doc Name
Approval with FW Due
From
DRMS
To
Transit Mix Concrete Co.
Email Name
TC1
TAK
BJC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mobilization Worksheet Cont'd Task#050 Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: COLORADO SPRINGS <br /> Total one-way travel distance: 15.00 miles <br /> Average Travel Speed: 50.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $706.02 <br /> *two round trips with haul rig. <br /> Total Roadable Mob/Demob Cost ** <br /> **one round trip,no haul rig: $0.00 <br /> Transportation Cycle Time: <br /> Non-Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 0.30 0.30 _ <br /> Return Time(Hours): 0.30 0.30 <br /> Loading Time(Hours): 0.25 NA <br /> Unloading Time(Hours): 0.25 NA <br /> Subtotals: 1.10 0.60 <br /> JOB TIME AND COST <br /> Total job time: 2.20 Hours <br /> Total job cost: $706 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.