Laserfiche WebLink
Mobilization Worksheet Cont'd Task#050 Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: COLORADO SPRINGS <br /> Total one-way travel distance: 15.00 miles <br /> Average Travel Speed: 50.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $706.02 <br /> *two round trips with haul rig. <br /> Total Roadable Mob/Demob Cost ** <br /> **one round trip,no haul rig: $0.00 <br /> Transportation Cycle Time: <br /> Non-Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 0.30 0.30 _ <br /> Return Time(Hours): 0.30 0.30 <br /> Loading Time(Hours): 0.25 NA <br /> Unloading Time(Hours): 0.25 NA <br /> Subtotals: 1.10 0.60 <br /> JOB TIME AND COST <br /> Total job time: 2.20 Hours <br /> Total job cost: $706 <br /> CIRCES Cost Estimating Software <br />