My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-10-26_PERMIT FILE - C1996083
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083
>
2006-10-26_PERMIT FILE - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:16:31 PM
Creation date
8/21/2014 1:15:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Permit File
Doc Date
10/26/2006
Doc Name
10/26/2006 Stability Evaluation of proposed South Coal Wastepile Buckhorn Geotech
Section_Exhibit Name
Volume XI Coal Mine Waste Disposal Area No. 3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9.0 CLOSING <br />This report has been prepared in a manner consistent with local standards of professional <br />geotechnical engineering practice. The interpretation of subsurface materials, strengths, and pore <br />pressure are based on our training and years of experience, but is necessarily based on limited <br />subsurface observation and testing. As such, inferred ground conditions cannot be guaranteed to <br />be exact. No other warranty, Express or Implied, is made. <br />We recommend that Buckhorn conduct a subsurface investigation at the proposed new gob <br />wastepile site to characterize the foundation conditions. Additionally, on -going strength testing <br />and in -situ moisture /density testing of the gob material is recommended <br />We sincerely appreciate the opportunity to work with you on this project. If you have any <br />questions or concerns regarding this report, please do not hesitate to contact us. <br />Respectfully Submitted, <br />Oc er 25, 2031L 06 <br />16!— <br />� <br />Brett R. Byler, P.E. <br />Geotechnical Engineer <br />v 'm 9291 �' v <br />�06,:`�W <br />NA1 �0\� <br />Bowie No 2 South Gob Pile preliminary stability evaluation <br />Project 405- 126- GEO -08 <br />Page 10 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.