My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-20_REVISION - M1992009
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1992009
>
2014-08-20_REVISION - M1992009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:25:32 PM
Creation date
8/21/2014 7:40:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992009
IBM Index Class Name
Revision
Doc Date
8/20/2014
Doc Name
TR Approval
From
DRMS
To
Gillette Sand and Gravel, Inc.
Type & Sequence
TR6
Email Name
TC1
TAK
BJC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: Maintenance bldg demolition cost summary _ <br /> Site: Gillette Pit Permit Action: TR06 Permit/Job#: M1992009 <br /> PROJECT IDENTIFICATION <br /> Task#: T60 State: Colorado Abbreviation: None <br /> Date: 2/14/2014 County: Teller Filename: M009-T60 <br /> User: TC1 <br /> Agency or organization name: DRMS <br /> TASK LIST (DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> T61 Maintenance Building Demo DEMOLISH 1 0.00 $1,689.72 <br /> T62 Transport 6T steel offsite MISCTRUK 1 8.00 $617.00 <br /> T63 Transport 14 to 18 CY conc. rubble offsite TRUCKI 1 2.98 $694.93 <br /> T64 Mob/Demob Loader MOBILIZE 1 3.00 $817.73 <br /> SUBTOTALS: 13.98 $3,819.38 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02% Total= $77.15 <br /> Performance bond: 1.05% Total= $40.10 <br /> Job superintendent: 0.00 hrs Total= $0.00 <br /> Profit: 10.00% Total= $381.94 <br /> TOTAL O&P= $499.19 <br /> CONTRACT AMOUNT(direct+O&P)= $4,318.57 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): 0.00 Total= 0.00 <br /> Engineering work and/or contract/bid preparation: 0.00% Total= $0.00 <br /> Reclamation management and/or administration: 5.00% $215.93 <br /> CONTINGENCY: 0.00 Total= $0.00 <br /> TOTAL INDIRECT COST= $715.12 <br /> TOTAL BOND AMOUNT(direct+indirect)= $4,534.50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.