My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-20_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-08-20_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:46:54 PM
Creation date
8/21/2014 7:24:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
8/20/2014
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Bowie Resources
Type & Sequence
TR89
Email Name
SLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Remove Gob 2 East Diversion 1/2 Culvert (F5) <br />Permit Action: Technical <br />Site: Bowie No. 2 Mine Revision 89 Permit /Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: OOS State <br />Date: 8/20/2014 County <br />User: SLB <br />Colorado <br />Delta <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C083 -OOS <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />369 <br />Remove temporary 1/2 culvert in Gob 2 East <br />DEMOLISH <br />1 <br />0.00 <br />$251.99 <br />Diversion <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0.00 <br />SUBTOTALS: <br />0 <br />$252 <br />INDIRECT COSTS <br />$5.09 <br />OVERHEAD AND PROFIT: <br />$2.65 <br />Liability insurance: <br />2.02% <br />Performance bond: <br />1.05% <br />Job superintendent: <br />0.00 hrs <br />Profit: <br />10.00% <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT <br />Total = <br />$5.09 <br />Total = <br />$2.65 <br />Total = <br />$0.00 <br />Total = <br />$25.20 <br />TOTAL O & P = <br />$32.94 <br />CONTRACT AMOUNT (direct + O & P) = <br />$284.94 <br />Financial warranty processing (legal /related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and /or contract/bid preparation: <br />4.00% <br />Total = <br />$11.40 <br />Reclamation management and /or administration: <br />3.13% <br />$8.92 <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$53.26 <br />TOTAL BOND <br />AMOUNT (direct + indirect) = <br />$305.26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.