Laserfiche WebLink
SECTION 02261 <br /> SOIL-BENTONITE SLURRY WALLS <br /> PART 1 - GENERAL <br /> 1.1 SCOPE OF WORK <br /> A. This section of the specifications includes requirements for the Slurry Trench Cutoff Wall and <br /> related work as indicated on the drawings and as hereinafter specified. The work consists of <br /> furnishing all plant,labor,equipment,and materials and of performing all operations as required <br /> to construct the slurry trench cutoff wall. The slurry wall shall be installed prior to any adjacent <br /> pipeline construction. <br /> 1.2 RELATED SPECIFICATION SECTIONS INCLUDE BUT ARE NOT NECESSARILY <br /> LIMITED TO: <br /> A. (Not Used) <br /> 1.3 REFERENCE STANDARDS <br /> A. The following is a list of standards that will be referenced in this specification. Such referenced <br /> standards shall be considered part of these specifications as if fully repeated herein. <br /> REFERENCE 'TITLE OR DESCRIPTION <br /> API Spec 13A IAPI Specification for Oil-Well Drilling-Fluid Materials <br /> API RP 13B-1 IAPI Recommended Practice Standard Procedure for <br /> Field Testing Water-Based Drilling Fluids <br /> ASTM C 138 Test Method for Unit Weight of Concrete <br /> ASTM C 143 Test Method for Slump of Concrete <br /> ASTM D 422 Particle-Size Analysis of Soils <br /> ASTM D 1140 Materials Finer than No.200 Sieve <br /> ASTM D 4318 Liquid Limit, Plastic Limit and Plasticity Index o <br /> Soils <br /> ASTM D 4380 Density of Bentonite Slurries <br /> --- -__ __--------- --- ---- ----------- --- ----------------- <br /> ASTM D 4381 Sand Content by Volume of Bentonite Slurries <br /> ASTM D 5084 Hydraulic Conductivity Using a Flexible Wall <br /> Permeameter <br /> 02261-1 <br /> GP Resources,LLC Soil-Bentonite Slurry Walls <br /> West Farm Pit Slurry Wall <br />