My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-31_PERMIT FILE - C1996083A (7)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2014-07-31_PERMIT FILE - C1996083A (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:46:15 PM
Creation date
8/20/2014 1:26:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
7/31/2014
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate RN3
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine C1996083 Technical Revision No. 84 Page 3 of <br />Task description: <br />Site: Bowie No. 2 Mine <br />BULLDOZER WORK <br />Backfill and Regrade Pond J Expansion <br />Permit Action: Technical Revision 84 Permit/Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 99A <br />Date: 3/6/2014 <br />User: SLB <br />State: Colorado <br />County: Delta <br />Agency or organization name: <br />DRMS <br />HOURLY EOUIPMENT COST <br />Basic Machine: <br />Cat D10T - 10SU <br />Horsepower: <br />574 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: C083 -99a <br />Total unit Cost/Hour: $354.34 <br />Total Fleet Cost/Hour: $354.34 <br />MATERIAL QUANTITIES <br />Source <br />Utilization % <br />Ownership Cost/Hour: <br />$131.86 <br />NA <br />Operating Cost/Hour: <br />$184.48 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $354.34 <br />Total Fleet Cost/Hour: $354.34 <br />MATERIAL QUANTITIES <br />Source <br />Initial Volume: <br />2,000 <br />Swell factor: <br />1.330 <br />Loose volume: <br />2,660 LCY <br />Source of estimated volume: Map 22.1; Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />100 feet <br />1.718.9 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient <br />Average site altitude: <br />Material weight: <br />Weight description: <br />0% <br />5,900 feet <br />2.900 lbs/LCY <br />Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />AVG. <br />Material consistency: 0.900 <br />CAT HB <br />Dozing method: 1.000 <br />GEN. <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.