Laserfiche WebLink
Task description: <br />Site: Bowie No. 2 Mine <br />PROJECT IDENTIFICATION <br />COST SUMMARY WORK <br />Permit Action: Technical <br />Revision 84 <br />Task #: OOF State: Colorado <br />Date: 3/6/2014 County: Delta <br />User: SLB <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job #: C1996083 <br />Abbreviation: None <br />Filename: C083 -OOF <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />354 <br />99a <br />Gob Pile #3 Structure Removal Update <br />DEMOLISH <br />1 <br />1 <br />0.00 <br />($10,165.61) <br />$1,543.00 <br />Backfill and Re grade Pond J Expansion <br />DOZER <br />4.35 <br />SUBTOTALS: <br />4.35 <br />($8,623) <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02% <br />Total = <br />($174.18) <br />Performance bond: 1.05% <br />Total = <br />($90.54) <br />Job superintendent: 0.00 hrs <br />Total = <br />$0.00 <br />Profit: 10.00% <br />Total = <br />($862.30) <br />TOTAL O & P = <br />($1,127.02) <br />CONTRACT AMOUNT (direct + O & P) = <br />($9,750.02) <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 Total = <br />0.00 <br />Engineering work and/or contractibid preparation: <br />4.00% Total = <br />($390.00) <br />Reclamation management and /or administration: <br />3.13% <br />($305.18) <br />CONTINGENCY: <br />0.00 Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />($1,822.20) <br />TOTAL BOND <br />AMOUNT (direct + indirect) = <br />($10,445.20) <br />