My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-20_REPORT - C1996083 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2014-08-20_REPORT - C1996083 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:46:53 PM
Creation date
8/20/2014 8:22:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Report
Doc Date
8/20/2014
Doc Name
2nd Qtr Waste Pile Report Review Response
From
Jim Stover & Associates, Inc
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
SLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D Cl <br />J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7T" STREEET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX: (970) 242 -7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />August 15, 2014 <br />Susan Burgmaier <br />Division of Reclamation, Mining & Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Bowie Resources, LLC, Bowie No. 2 Mine <br />2nd Quarter Coal Mine Waste Banks, Instrumentation Monitoring <br />Permit C- 1996 -083 <br />Dear Ms. Burgmaier: <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />The DRMS' letter dated August 15, 2014 submitted its complete adequacy response for <br />2nd Quarter coal mine waste banks inspection report and June 2014 VWP monitoring <br />results. On behalf of Bowie Resources, LLC, following are its responses to the <br />adequacy letter. <br />DRMS - BRL must either reconstruct the Gob Pile #1 as designed or submit a <br />revised construction and reclamation plan that demonstrates that the current <br />configuration meets the requirements of Rules 4.09 and 4.10. <br />BRL - BRL will regrade the steep section on Gob Pile #1 to a 2H:1 V slope or <br />flatter. <br />2. DRMS - Please submit a summary of the required survey data indicating the <br />volume of cover material currently available for Gob Piles #1, #2, #3, and #4. <br />BRL - No cover material was moved during the quarter. <br />3. The attached letter from Huddleston -Berry responds to items 3 and 4. Enclosed <br />are three proctor curves that were not submitted with the second quarter report. <br />5. DRMS - Given the sharp rise in pore pressure observed at VWP -06 in June, the <br />Division will require that the monthly VWP monitoring frequency be continued, for <br />VWP -06 and VWP -08, at least until the pressures decrease or level out. VWP- <br />
The URL can be used to link to this page
Your browser does not support the video tag.