My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-19_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-08-19_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2020 4:18:09 PM
Creation date
8/20/2014 7:31:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/19/2014
Doc Name
Weekly CQA Report: Week ending 08/09/14.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
am <br /> CRIPPLE CREEK &VICTOR GOLD MINING Co. <br /> ANGLOGOLD ASHANTI (COLORADO) <br /> SQUAW GULCH (VLF) & HWY 67 RE-ALIGNMENT MONITORING WEEKLY REPORT <br /> Owner: Cripple Creek&Victor Gold Mining Co. Project Number: 74201125NO <br /> Project: Squaw Gulch Valley Leach Fill (VLF) Week Ending: August 09, 2014 <br /> Location: Cripple Creek &Victor Gold Mine, CO <br /> Contractor: Ames Construction, Inc. <br /> Reporting Period: 08.03.2014 through 08.09.2014 <br /> Days S I M T W T F S <br /> D D D D D D D <br /> Work Shifts <br /> D=Day Shift N=Night Shift W=Weather clay <br /> Ambient Temperature Ranges During Week Weather Conditions During Week: <br /> Highs: 71OF to 760F Cloud Cover: Overcast to partly cloudy <br /> Lows: 44°F to 55°F Precipitation: Rain: Sun, Mon,Tues,Wed, <br /> Thurs, Fri, Sat. <br /> Wind: Variable <br /> Ames: Continuing construction tasks for the Valley Leach Facility(VLF). <br /> Planning: Continuing construction activities and scheduling for the VLF. <br /> CONSTRUCTION ACTIVITIES AND PROGRESS: <br /> 1) Earthworks <br /> A) VLF(PSSA, Phase 1 and 2) <br /> Topsoil/Overburden Stripping: None. <br /> Tree Grubbing and Clearing,Chipping: None. <br /> Production Drilling: No production drilling was performed within the VLF limits. <br /> Production Blasting: No production blasting took place within the VLF. <br /> Structural Fill: <br /> All structural fill material discussed below was placed and compacted per the technical <br /> specifications. <br /> A Cat loader filled Cat 740 haul trucks with stockpiled structural fill material located at ADR haul <br /> road station 60+00. Cat dozers cut material west of the Anaconda Mine Complex and from the <br /> Ball Mill crossing area. A Cat excavator loaded Cat 740 haul trucks with excess material graded <br /> from the ADR haul road near station '12+00. Material from these areas was transported to and <br /> placed as structural fill upslope of the ADR haul road station 65+00, between stations F8+00 to <br /> F12+00 upslope to stations H4+00 to H8+00, and upslope of stations J12+00 to J14+00. <br /> 2014.08.09-mle2 weekly final.docx Page 1 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.