EXHIBIT D <br /> ALTERNATE RECLAMATION PLAN B(Sheet 2A of 2): <br /> The mining limits of this Reclamation Plan are a 0.98 acre site and 0.37 acre site located in the <br /> northwesterly corner of the permit boundary. The remainder of the Permit Boundary area lying <br /> outside of the mining limits is undisturbed and is not a part of this Reclamation application. <br /> Luke the Duke,LLC is proposing to reclaim the two existing pits to General Agricultural.The pits <br /> will be plated with approximately 8"-12" of overburden and then covered with the stockpiled <br /> topsoil and sculptured into the existing terrain at a 3:1 slope.No other slopes were disturbed during <br /> the mining process. <br /> To prevent soil compaction no wheel or track mounted vehicles or equipment will be allowed on <br /> the reclaimed surface subsequent to top soil installation.To stabilize the non-compacted top soil a <br /> Dry land Pasture blend seed mixture will be no till drilled over the topsoil at a rate of 20lbs per <br /> acre. The seed will be hand raked into the topsoil. New lawn fertilizer will be applied per the <br /> manufacturer's requirements. Straw mulch will be hand spread at a rate of one ton per acre. The <br /> applicant will be responsible for any weed control once the grass is established. The site will be <br /> seeded in the spring of 2015. <br /> The stockpiled gravel will be removed and used for the maintenance of the subdivision roads <br /> within Avery Ranch, Horseman's Park, Cross Creek Ranch, the Highlands at Cross Creek Ranch <br /> and the Preserve. <br /> No office,shop/maintenance buildings,processing facilities,or underground openings are existing <br /> or proposed.No on-site water is to be used in conjunction with this operation. The hydrology of <br /> the site will not be altered from its natural flows. <br /> The estimated start date of this Reclamation Project would be September 2014 and the completion <br /> date would be in the spring of 2015. The maximum disturbance point of this mining would be at <br /> the time the remaining gravel is removed from the site. <br /> 1. SPREAD TOPSOIL ON SITE: <br /> Hourly Equipment Cost <br /> Ownership Cost/Hour =$ 46.94 <br /> Operating Cost/Hour =$ 69.39 <br /> Operator Cost/Hour = $ 38.54 <br /> Fleet Size(No. Units) = 1 <br /> TOTAL UNIT COST/HOUR =$ 154.87 <br />