My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-07_PERMIT FILE - C1981014A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981014
>
2014-08-07_PERMIT FILE - C1981014A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:46:32 PM
Creation date
8/19/2014 2:16:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014A
IBM Index Class Name
Permit File
Doc Date
8/7/2014
Section_Exhibit Name
4.05 Hydrologic Balance
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• constituents are expected to be minor, will generally be buffered by <br />normal runoff from undisturbed areas, will not affect surface water use, <br />and will continue to meet applicable effluent limitations under EFCI's <br />NPDES permits. Amore detailed discussion of potential water quality <br />impacts is presented in Section 2.05.6, Mitigations of Surface Coal Mining <br />Operation Impacts. <br />4.05.3 HYDROLOGIC BALANCE: DIVERSIONS AND CONVEYANCE OF OVERLAND FLOW AND <br />SHALLOW GROUNDWATER FLOW AND EPHEMERAL STREAMS DRAINING A <br />WATERSHED OF LESS THAN ONE SOUARE MILE <br />The drainage and sediment control plan described in Section 2.05.6, <br />Mitigation of Surface Coal Mining Operation Impacts, provides for <br />temporary diversion of the ephemeral Magpie Creek drainage, and overland <br />flows and shallow groundwater flows from the undisturbed area upgradient <br />and west of permanent coal refuse stockpiles. In addition, a system of <br />temporary ditches in both the mine and loadout areas function to collect <br />• and route runoff from disturbed areas to the existing sedimentation ponds. <br />These ditches and other sediment control structures are shown on the Mine <br />Area Surface and Groundwater Hydrology Map, (Map 12), Loadout Area Surface <br />and Groundwater Hydrology Map, (Map 13) and Drainage and Sediment Control <br />Map, (Map 20). All temporary diversion structures are designed and <br />constructed to pass the peak runoff from a precipitation event with at <br />least a two (2) year recurrence interval with a minimum of 0.3 feet of <br />freeboard. Ditch configuration, gradient and lining requirements reflect <br />hydrologic design calculations and will be effective in preventing erosion <br />and minimizing additional contributions of suspended sediment to runoff <br />flows. Design methodology and hydrologic calculations for the temporary <br />diversion structures are presented in Exhibit 19, Drainage and Sediment <br />Control Plan. <br />Most of the temporary diversion ditches in both the mine and loadout <br />areas, including ditches CD-1, CD-2, CD-3, the access road collection <br />ditch, and the loadout area perimeter ditch, are designed to safely pass <br />• the peak discharge from a 5-year, 24-hour storm event. Remaining <br />temporary ditches including the railway and stockpile containment ditches, <br />and the topsoil stockpile containment ditch in the loadout area, are <br />4.05-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.