Laserfiche WebLink
7 (FORM 2 -Public filing) <br /> 7. List the seed mixture to be used in the re-establishment of vegetation. See the attached seed mixture calculation to obtain <br /> PLS/acre. For assistance with formulating seed mixtures and rates, contact the local NRCS if on private land, BLM/USFS if on <br /> public land or State Land Board if on state land. <br /> A. Provide plant name and seeding rate <br /> Non-Irrigated Native Grass Mix <br /> Species %in mix Seeding Drilled Rate, PLS Broadcasted Rate, PLS <br /> Rate PLS Pounds Per Acre Pounds Per Acre <br /> Pounds/acre <br /> Indian Ricegrass 10 x 12 = 1.2 2.4 <br /> tuckspike Wheatgrass* 20 x 10 = 2.0 4.0 <br /> Slender Wheatgrass 10 x 11 = 1.1 2.2 <br /> Western Wheatgrass* 40 x 16 = 6.4 12.8 <br /> Sandberg Bluegrass 10 x 2 = 0.2 0.4 <br /> Blue Grama 10 x 3 = 0.3 0.6 <br /> 100% 11.2 Ibs PLS 22.4 Ibs PLS <br /> B. Describe the method for seed bed preparation,and application method for grass/forb seeding: <br /> Surface shall be scarified. Seeding shall be accomplished using a hand spreader or suitable mechanical spreader. <br /> V. TERMS AND CONDITIONS FOR PROSPECTING OPERATIONS: <br /> 1. Reclamation measures shall be fulfilled in a timely manner and completed within five (5)years of completion of prospecting <br /> actiN ities. <br /> 2. The prospecting operations described in this Notice will be conducted in such a manner as to minimize surface disturbances. <br /> In addition to the measures required in Rule 5,precautions to be taken include: <br /> A. Confinement of operations to areas near existing roads or trails, where practicable. Existing roads which are to remain as <br /> oermanent roads after prospecting activities are completed shall be left in a condition equal to or better than the pre- <br /> orospecting condition; <br /> B. Drilling shall be conducted in such a way as to prevent cuttings and fluids from directly entering any dry or flowing <br /> .stream channel. Drill cuttings must be spread to a depth no greater than one-half (1/2) inch or buried in an approved <br /> disposal pit; <br /> C. ?roper and timely abandonment of drill holes upon completion of drilling; <br /> D. Zeclamation of affected lands upon completion of operations or phases of an operation;, <br /> E. 3ackfilling and revegetating any pits to blend in with the surrounding land surface; <br /> F. Safeguarding mine entries,trenches and excavations from unauthorized entry at all times; <br /> G. Disposal of any trash,scrap metal,wood,machinery,and buildings; <br /> H. Control of noxious weeds within the area affected by the prospector <br /> 3. The prospecting operations shall be conducted in such a manner as to comply with all applicable local, state and federal laws <br /> and regulations including applicable state and federal air and water quality laws and regulations. <br />