My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-04_PERMIT FILE - M2014030
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2014030
>
2014-06-04_PERMIT FILE - M2014030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2020 12:16:09 AM
Creation date
8/13/2014 9:32:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2014030
IBM Index Class Name
Permit File
Doc Date
6/4/2014
Doc Name
USFS POO
From
USFS
To
DRMS
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H. Reclamation. Describe the annual and final reclamation standards based on the anticipated schedule for constriction, <br /> operations, and project closure. Include such items as the removal of structures and facilities including bridges and culverts, a <br /> revegetation plan,permanent containment of mine fallings,waste,cr sludges which pose a threat of a release into the environment, <br /> closing ponds and eliminating standing water a final surface shaping plan,and post operations monitoring and maintenance plans. <br /> All disturbed a eas will be returned as close to original contour as possible as work is completed in that area and seeded <br /> approved seed mixture. <br /> VI. FOREST SERVICE EVALUATION OF PLAN OF OPERATIONS <br /> A. Required changestmodifications/special mitigation for plan of operations: <br /> B, Bond. Reclamation of all Jisturbances, connected with this plan of operations is covered by Reclamation <br /> Performance Bond No 'dated (mm/ddfyy)+ xPond <br /> , signed by (Principal) and (Surety), for the i✓w <br /> penal sum o#i.'fy_C_. This Reclamation Performance is a guarante6 of faithful performance with the terms and <br /> conditions listed below, and with the reclamation requirements agreed upon in the plan of operations. This <br /> Reclamation Performance Bond also extends to and includes any unauthorized activites conducted in connection <br /> with this operation. <br /> The bond amount for this Reclamation Performance Bond was based on a bond calculation worksheet The bond amount may be <br /> adjusted during the tern of this proposed plan of operations in response to changes in the operations or to changes in the economy. <br /> Both the Reclamation Performance Bond and the bond calculation wofksheet are attached to and made part of this plan of <br /> operations. Acceptable bond securities(subject to change)include: <br /> 1. Negotiable Treasury bilk and notes which are unconditionally guaranteed as to both principle and interest in an amount <br /> equal at their par value to the penal sum of the bond,-or <br /> 2. Certified or cashier's check,bank draft,Post Cffice money order,cash,assigned certificate of deposit assigned savings <br /> account,blanket bond,or an irrevocable letter of credit equal to the penal sum of the bond. <br /> of mare space is needed to Jill out a block of iafbnxarion,use odditional sheen and attach form) <br /> -6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.