Laserfiche WebLink
Exhibit "D" Reclamation Plan <br /> During operations the overburden will be placed to the side of the active dig site so,as to <br /> be easily pulled back into the hole that was excavated.The excavator is used for both the digging <br /> and reclamation phases of the operation.The filled holes will be smoothed to current contours <br /> and all evidence of our disturbance will be mitigated as best possible.In addition to reclaiming <br /> our own hole we also reclaim any nearby digs both recent and historical leaving the area better <br /> than when we started. <br />