My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-12_REVISION - M1991035
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1991035
>
2014-08-12_REVISION - M1991035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:19:10 PM
Creation date
8/13/2014 9:32:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991035
IBM Index Class Name
Revision
Doc Date
8/12/2014
Doc Name
TR Submittal
From
Lafarge West, Inc.
To
DRMS
Type & Sequence
TR4
Email Name
TAK
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0171 <br /> COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> •,�,�y 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)$66-3567M <br /> REQUEST FOR TECHNICAL REVISION(TR)COVER SHEET <br /> File No.: M-J'6 k - 035 Site Name: <br /> County TR# (DRMS Use onlyl <br /> Permittee: L_4y4, e LJ�s+� =nc. <br /> Operator(If Other than Permittee): <br /> Permittee Representative: JGAt.3 Zisc.� , LAI-ld Yt 4A.MyuL <br /> Please provide a brief description of the proposed revision: See- e.�4,5 c_l <br /> As defined by the Minerals Rules,a Technical Revision JR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review" until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type -Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Tyne Required TR Fee Submitted (mark only one) <br /> I IOc, 111, 112 construction ® RECEIVED <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 0 AUG 12 7114 <br /> DIVISION OF RECLAMATION <br /> I IOd, 112d(1, 2 or 3) $1006 MINING AND SAFETY <br />
The URL can be used to link to this page
Your browser does not support the video tag.