Laserfiche WebLink
BORING NUMBER RWB-05 <br /> o <br /> W ldcW PAGE 1 OF 1 <br /> ion <br /> a A "44i,�ning-P.,Corp�R(I.M <br /> CLIENT Wildcat Mining Corporation PROJECT NAME New Access Road <br /> PROJECT NUMBER Geotech-001 PROJECT LOCATION Hesperus,Colorado <br /> DATE STARTED 1/19/12 COMPLETED 1/19/12 GROUND ELEVATION 8676.36 ft HOLE SIZE 6.75 in <br /> DRILLING CONTRACTOR Enviro-Drill GROUND WATER LEVELS: <br /> DRILLING METHOD Hollow Stem Auger 2.75'ID AT TIME OF DRILLING -No Free Water Encountered <br /> LOGGED BY David McLay,P.E. CHECKED BY J.Erich Rauber,P.E. AT END OF DRILLING --No Free Water Encountered <br /> NOTES AFTER DRILLING --No Free Water Encountered <br /> w <br /> a <br /> _ w W �� TESTS _ <br /> — wm w �z� c9 <br /> p I Z UO m O> REMARKS O MATERIAL DESCRIPTION <br /> � <br /> UZ U <br /> 0 <br /> (CL)Brown gravelly silty Clay(stiff)(fill) <br /> CL <br /> MC 56 8-6-7 w=11.7%, 14.0 8672A <br /> 5 .5'-5. (13) DD=102.7 (SW-SM)low plasticity Tan silty fine Sand(dense) <br /> SW- <br /> SM <br /> MC 58 6-41 w=8.8%, <br /> 10 0-9. DD=116.5 cf <br /> LL=38,PI=17 <br /> a <br /> �? ° 12.0 8664A <br /> a Refusal at 12.0 feet. <br /> a <br /> Bottom of borehole at 12.0 feet. <br /> m <br /> r <br /> U <br /> W <br /> 0 <br /> a: <br /> a. <br /> F <br /> z <br /> 9 <br /> w <br /> J <br /> w <br /> 0 <br /> O <br /> Of <br /> n. <br /> U <br /> m <br /> N <br /> O_ <br /> N <br /> N <br /> M <br /> H <br /> m <br /> a <br /> J <br /> U) <br /> D <br /> r <br /> m <br /> z <br /> c� <br /> J <br /> J <br /> W <br /> a <br /> x <br /> m <br /> J <br /> w <br /> z <br /> w <br /> . <br />