My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-28_INSPECTION - M2001001 (3)
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2001001
>
2014-07-28_INSPECTION - M2001001 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2020 4:27:30 AM
Creation date
8/12/2014 11:59:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001001
IBM Index Class Name
Inspection
Doc Date
7/28/2014
Doc Name
CIRCES Calculation- No SI
From
DRMS
To
File
Inspection Date
7/24/2014
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task#004 Page 2 of 2 <br /> Cycle Time: <br /> Scraper Loading Time: 1.00 Minutes <br /> Maneuver and Spread Time: 0.60 Minutes <br /> Job Condition Correction: Site Altitude: 7200 feet <br /> Scraper I Push Dozer Source <br /> Altitude Ad: 1.000 NA CAT HB <br /> Job Efficiency: 0.830 NA AT HB <br /> Net Correction: 0.830 NA <br /> Travel Time: <br /> Road Condition: Rutted dirt,little maintenance,no water,2"tire penetration 5.0 <br /> Haul Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity(fpm) Travel Time <br /> (min) <br /> 1 1 400.00 2.00 5.00 7.00 1362 0.36 <br /> Haul Time: 0.36 minutes <br /> Return Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity(fpm) Travel Time <br /> (min) <br /> 1 400.00 -2.00 5.00 3.00 2949 0.28 <br /> Return Time: 0.28 minutes <br /> Total Scraper team cycle time: 2.24 minutes <br /> Adjusted for job conditions: 1,289.46 LCY/Hour <br /> Selected Number of Scrapers: 2 Scraper(s) <br /> Adjusted single scraper team(unit)hourly production: 1,289.46 LCY/Hour <br /> Adjusted multiple scraper team(fleet)hourly production: 1,289.46 LCY/Hour <br /> Unadjusted unit production/hour: 1,553.57 LCY/Hour <br /> Optimal Number of Scrapers per push dozer: <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 12.44 Hours <br /> Unit cost: $0.601 /LCY Total job cost: $9,641 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.