Laserfiche WebLink
Scraper Worksheet Cont'd Task#004 Page 2 of 2 <br /> Cycle Time: <br /> Scraper Loading Time: 1.00 Minutes <br /> Maneuver and Spread Time: 0.60 Minutes <br /> Job Condition Correction: Site Altitude: 7200 feet <br /> Scraper I Push Dozer Source <br /> Altitude Ad: 1.000 NA CAT HB <br /> Job Efficiency: 0.830 NA AT HB <br /> Net Correction: 0.830 NA <br /> Travel Time: <br /> Road Condition: Rutted dirt,little maintenance,no water,2"tire penetration 5.0 <br /> Haul Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity(fpm) Travel Time <br /> (min) <br /> 1 1 400.00 2.00 5.00 7.00 1362 0.36 <br /> Haul Time: 0.36 minutes <br /> Return Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity(fpm) Travel Time <br /> (min) <br /> 1 400.00 -2.00 5.00 3.00 2949 0.28 <br /> Return Time: 0.28 minutes <br /> Total Scraper team cycle time: 2.24 minutes <br /> Adjusted for job conditions: 1,289.46 LCY/Hour <br /> Selected Number of Scrapers: 2 Scraper(s) <br /> Adjusted single scraper team(unit)hourly production: 1,289.46 LCY/Hour <br /> Adjusted multiple scraper team(fleet)hourly production: 1,289.46 LCY/Hour <br /> Unadjusted unit production/hour: 1,553.57 LCY/Hour <br /> Optimal Number of Scrapers per push dozer: <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 12.44 Hours <br /> Unit cost: $0.601 /LCY Total job cost: $9,641 <br /> CIRCES Cost Estimating Software <br />