Laserfiche WebLink
Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Redistribute toposoil 3 inch depth over 5 acres <br /> Site: Hankins Stone Quarry#1 Permit Action: 2014 Inspection Permit/Job#: M2000154 <br /> PROJECT IDENTIFICATION <br /> Task#: 003 State: Colorado Abbreviation: None <br /> Date: 8/11/2014 County: San Miguel Filename: M154-003 <br /> User: KAP <br /> Agency or organization name: DBMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU <br /> Horsepower: 310 <br /> Blade Type: Semi-Universal <br /> Attachment: I-shank ripper <br /> Shift Basis: I per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $70.00 NA <br /> Operating Cost/Hour: $108.22 100 <br /> Ripper op.Cost/Hour: $0.00 0 <br /> Operator Cost/Hour: $38.01 NA <br /> Total unit Cost/Hour: $216.23 <br /> Total Fleet Cost/Hour $216.23 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 2,017 <br /> Swell factor: 1.000 <br /> Loose volume: 2,017 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance: 150 feet <br /> Unadjusted hourly production: 634.3 LCY/hr <br /> Materials consistency description: Rock,well ripped or blasted 0.8 <br /> Average push gradient: -10% <br /> Average site altitude: 6,500 feet <br /> Material weight: 2,550 lbs/LCY <br /> Weight description: Earth-Dry packed <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 0.800 CAT HB <br /> Dozing method: 1.000 GEN. <br /> CIRCES Cost Estimating Software <br />