Laserfiche WebLink
Mobilization Worksheet Cont'd Task#007 Page 2 of 2 <br /> EOUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: CORTEZ <br /> Total one-way travel distance: 18.00 miles <br /> Average Travel Speed: 40.00 mph <br /> Total Non-Roadable Mob/Demob Cost <br /> `*two round trips with haul rig: $8,102.21 <br /> Total Roadable Mob/Demob Cost** <br /> **one round trip,no haul rig: $13.77 <br /> Transportation Cycle Time: <br /> Non-Roadable Roadable <br /> Equipment <br /> Equipment <br /> Haul Time(Hours): 0.45 0.45 <br /> Return Time(Hours): 0.45 0.45 <br /> Loading Time(Hours): 1.50 NA <br /> Unloading Time(Hours): 1.50 NA <br /> Subtotals: 3.90 0.90 <br /> JOB TIME AND COST <br /> Total job time: 7.80 Hours <br /> Total job cost: $8,116 <br /> CIRCES Cost Estimating Software <br />