Laserfiche WebLink
sheet t of 2 <br /> CIRCES Cost Estimating Software <br /> SCRAPER TEAM WORK <br /> _ - <br /> PROJECT IDENTIFICATION - <br /> Agency or organization name:Colorado Division Of Reclamation Mining And Safety <br /> Task#: 004 State:Colorado Permit/job#:M-1994-108 <br /> Date: 09/22/2010 County:Montezuma Abbreviation:none <br /> User: KAP Site:Cedar Point Filename:M108-004 <br /> Permit or other job action:Amendment <br /> Task description:Topsoll Replacement at 6 inch depth over 36 acres <br /> HOURLY EQUIPMENT COST <br /> Shift basis: 1 per day <br /> Equipment Description <br /> Scraper work team-Scraper:Cat 633E Series 2(2001) <br /> -Push dozer NA <br /> Support equipment-Load area:Cat D8R Series li-8U(2005) <br /> -Dump area:Cat D8R Series ti-8U(2005) <br /> Road maintenance-Motor grader:NA <br /> -Water truck:NA <br /> Cost Breakdown : Scraper Work Team Support Equipment Road Maintenance Equipment <br /> Scraper Dozer Load area Dump area Grader Water truck <br /> Import data filename: scraper2 NA dozer dozer NA NA <br /> %Utilization-machine: 100 NA 50 50 NA NA <br /> -Ripper attachment: NA NA NA NA NA NA <br /> Ownerhip costthour: $80.67 NA $46.56 $46.56 NA NA <br /> Operating cost/hour: $117.94 NA $35.31 $35.31 NA NA <br /> Ripper op.cost/hour NA NA $0.00 $0.00 NA NA <br /> Operator cost(hour: $24.98 NA 1 $38.54 $38.54 NA NA <br /> Unit subtotals: $223.59 NA $120.41 $120.41 NA NA <br /> Number of units: 2 0 1 1 0 0 <br /> Group subtotals: Work: $447.17 Support: $240.82 Maintenance: $0.00 <br /> Total work team cost/hour: $687.99 <br /> MATERIAL QUANTITIES <br /> Initial Swell Loose <br /> volume: 29,040 LCY factor: NA volume: 29,040 LCY <br /> Source of quantity take-off:Reclamation Plan <br /> Source of estimated swell factor:NA <br />