Laserfiche WebLink
Page 1 of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Replace Topsoil <br /> Permit Action: 2014 SO-0I Cost <br /> Site: McCormick Pit Estimate Permit/Job#: M2001052 <br /> PROJECT IDENTIFICATION <br /> Task#: 005 State: Colorado Abbreviation: None <br /> Date: 8/8/2014 County: Kit Carson Filename: M052-005 <br /> User: ERR <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 637G <br /> -Dozer: NA <br /> Support Equipment-Load Area: NA <br /> -Dump Area: Cat D8T-8SU <br /> Road Maintenance—Motor Grader: CAT 14M <br /> -Water Truck: Water Tanker,3,500 Gal. <br /> Cost Breakdown: Scraper Work Team Support E ui ment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA NA 100 25 50 <br /> Ownership cost/hour: $107.02 NA NA $69.05 $42.03 $10.57 <br /> Operating cost/hour: $239.91 NA NA $108.22 $17.47 $18.21 <br /> Ripper op.cost/hour: NA NA NA $1.86 $0.00 $0.00 <br /> Operator cost/hour: $33.56 NA NA $38.01 $24.47 $27.88 <br /> Unit Subtotals: $380.50 NA NA $217.14 $83.96 $56.67 <br /> Number of Units: 3 0 0 1 1 1 <br /> Group Subtotals: Work: $1,141.50 Support: $217.14 Maint: $140.63 <br /> Total work team cost/hour: $1,499.27 <br /> MATERIAL QUANTITIES <br /> Initial volume: 28,233 CCY Swell factor: 1.215 <br /> Loose volume: 34,303 LCY <br /> Source of estimated volume: Application:Avg. 7"across 30 acres <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 1,600 lbs/LCY Struck Volume: 24.00 LCY <br /> Material description: Top Soil Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 51.00 LCY Adjusted Capacity: 29.00 LCY <br /> CIRCES Cost Estimating Software <br />