Laserfiche WebLink
ITC Resources, LLC <br /> 135 Meeker St 970-387-0600 <br /> Delta, Co 81413 Email:Info@ITCResources.us <br /> August 5, 2014 <br /> Bob Oswald <br /> Environmental Protection Specialist RECEIVED , <br /> Colorado Division of Reclamation <br /> Mining and Safety PAU6 1 1 2014 <br /> 1313 Sherman Street, Room 215 <br /> Denver, Co 80203 DIVISION OF RECLAMATION <br /> MINING AND SAFETY <br /> Mr. Oswald, <br /> The following is our res��Onsn regards to the letter you sent dated August 1 St, 2014. <br /> This should address the`questions you submitted to us in regards to the Vulcan <br /> Exploration Project, File No. P-2014-Q10, Technical Adequacy Review. <br /> 1. There are no mudpits to 'bee constructed at any drilling sites. Portable <br /> containment troughs will be used. <br /> 2. No earthwork will need to done, all drilling sites chosen will accommodate <br /> the J K Smit Diesel (94 HP) Hydraulic Core Drill on Rubber Tracks, Weight= <br /> 8000 k, Width= 72", Length= 13'. The 1978 Ford F600 4X4 water truck with <br /> a 1000 gallon water tank. And support vehicles for the drilling crew and <br /> geologists. <br /> 3. The seeding mixture is included in case there is any disturbance outside of the <br /> historically disturbed area. We do not anticipate any disturbance outside of <br /> these areas, but should there be any then this is the seed mix we will use <br /> reseeding those areas. <br /> 4. Our plan is to drill two holes on each drill setup. We will leave one hole open <br /> while drilling the hole next to it. Both holes will be closed at that drill <br /> location before moving on to the next location. <br /> If you have any questions, or if these responses need further clarification, then please <br /> contact me at any time. <br /> Sincerely, <br /> Jeff Schaaf <br /> ITC Resources, LLC <br />